Infrastructure, Roads & Bridges



2007 - KUTKM / UTEM, MELAKA

• Construction of 2.3 km single carriageway 2 lane road over North South Expressway and widening of Ayer
  Keroh Interchange Bridge at Ayer Keroh, Melaka, Malaysia 
• Client - Government of Malaysia
• RM 44.90 Million (USD 14.03 Million)



2002 - SULAIMAN ROAD (Phase ll)

• Design and build of coastal road linking Kota Kinabalu - Sulaiman at Kota Kinabalu, Sabah, Malaysia
• Client - Government of Malaysia
• RM 314.60 Million (USD 98.31 Million) & RM19.88 Million (USD 6.21 Million) 


1999 - UNIVERSITI MALAYSIA SABAH (INFRASTRUCTURE)

• Design and build infrastructure works including sewerage and roads for the 999 acres of land for the
  construction of the university’s buildings, Sabah, Malaysia
• Client - Universiti Malaysia Sabah
• RM 385 Million (USD 120.31 Million)  




1996 - ZARINA INDUSTRIAL PARK

• Construction of infrastructure works including roads for the 102 acres of land into 110 industrial lots in
  Alor Gajah, Melaka, Malaysia
• Client - Zarina Holdings Sdn Bhd
• RM 13.10 Million (USD 4.09 Million)  



1996 - DAMAI LAUT JETTY

• Construction of road works and jetty in Lumut, Perak, Malaysia
• Client - Damai Laut Golf Resort
• RM 6.10 Million (USD 1.91 Million)

 

replica watches
swiss rolex replica watches
best replica omega watches ralph lauren long sleeve audemars piguet swiss replica omega fakes best wedding dress designers polo ralph lauren outlet store